RMS RMS
Australia East Timor Vanuatu

Maliana 1 Irrigation System

The structures in Maliana 1 Headworks for rehabilitation and improvement included:

  1. Fixed weir
  2. Crossing type concrete block
  3. Scouring sluice gate structure
  4. Right bank protection wall
  5. Left bank protection wall
  6. Intake gate structure
  7. Connection canal
  8. Sediment settling basin
  9. Scouring gate intake structure
  10. Canal intakegate structure
  11. Storage for O & M Equipment bulding
  12. Gate Keeper’s house.

Outcome

  • Fixed Weir
  • Crossing type concrete block
  • Scouring sluice gate structure
  • Left bank protection wall
  • Intake gate structure
  • Connection canal
  • Sediment settling basin
  • Scouring gate structure
  • Canal intake gate structure
  • Gate Keeper’s house
  • Storage for O & M Equipment

Details and Contact

Duration: August 2008-Feb 2009
Client: TOA Corporation
Contact: Masanori Suzuki (GM)
Phone: +81-3-5226-1233
Value: $1,706,565.57 USD

Connect With Us